Projects

Health

 

 
Logo of Bluewater Project Management partner Aroha Healthcare

Aroha Healthcare, Wellington

New Hospital

Aroha Health is a state-of-the-art private hospital located in Newton Wellington. Focusing on a premium standard of care, this hospital will be built to Importance Level 4 (IL4) with full base isolation and the ability to operate continuously in emergency mode for up to 48 hours.  This seven-storey hospital will include six operating theatres, 24 patient bedrooms, four-bed high-dependency unit (HDU),in addition to consultancy rooms and a full radiology suite.

Te Whatu Ora - Te Toka Tumai Auckland

MRI Upgrade - north shore hospital

Full refurbishment and upgrade of the existing MRI at North Shore hospital. From design and consent management through to main contractor procurement, magnet supplier interface and construction management and administration, this project was completed in a live clinical environment whilst maintaining all adjacent clinical services.

 

Te Whatu Ora - Te Toka Tumai Auckland

TWT Anti-Ligature / Nursecall

The TWT project is a mental health programme of works that is progressively upgrading anti ligature points within bathrooms, new security doors and fully integrated security and nurse call system all within an acute mental health facility.  These works are being undertaken within a live mental health facility to minimise the opportunity of self harm.  This is difficult project requiring strong stakeholder relationships and contractor management to ensure works conducted in this environment are completed safely for all involved with a strict adherence to health and safety protocols.

Te Whatu Ora - Te Toka Tumai Auckland

Radiation Oncology BRACHYTHERAPY UNIT

The Radiation Oncology Department at Te Toka Tumai is currently underway with a complex program of works in order to upgrade of some of its major service offerings. In addition to its existing suite of services the hospital is undertaking the design and construction of a dedicated Brachytherapy bunker with the key driver of improved patient experience at the heart of this development. Responsible for the full project management service offering, design is well underway with construction on track to start at the end of 2025.

 

Te Whatu Ora - Te Toka Tumai Auckland

A32 Level 3 & Level 5 MRI Projects

Fleet upgrade of an existing L5 MRI scanner as well as the installation of a new L3 MRI scanner thereby increasing the total number of MRI magnets at ADHB to four. The new L3 machine has specific cardiac functionality thereby decreasing patient waiting times as well as increasing overall MRI capacity.

Te Whatu Ora - Te Toka Tumai Auckland

LabPlus Covid PC2 Laboratory Project

Urgent design and construction of a new PC2 laboratory to assist with the ADHB response to the Covid pandemic. Quadrupling additional testing capacity was critical to facilitate a timely response to Aucklands ability to deal with the pandemic.

 

Te Whatu Ora - Waitematā / Te Toka Tumai Auckland

Xray & CT Refurbishment Project

Full fleet replacement of the existing Radiology Xray and CT machines at both ADHB Grafton and WDHB Northshore campuses including full refurbishment of adjacent spaces, conducted in a live operational environment and covid lockdown procedures.

Te Whatu Ora - Te Toka Tumai Auckland

ONCOLOGY CT REMODELLING

In order for ADHB Radiotherapy to provide a full model of care for patients, the existing CT machines required a comprehensive overall. Bluewater managed the staged refurbishment from inception through to completion including full integration with the external CT supplier. The new space, whilst aesthetically pleasing from a patient experience perspective, also now accommodates a suite of anaesthetic procedures, intravenous contrast and thermoplastic immobilisation as well as emergency care if required.

 

Te Whatu Ora - Te Toka Tumai Auckland

Histology Improvements

ADHB - Histology refurbishment to Level 2, Building 31, Grafton Campus. Whilst the actual area of refurbishment is small, it is a technically complex environment within a functioning PC2 laboratory. A high level of planning and co-ordination is required for both the design phase and also for delivery as well. 

Te Whatu Ora - Te Toka Tumai Auckland

Facilities Infrastructure Remediation Program

A complex 10 year program of works worth approximately $1B, was undertaken to replace upgrade and futureproof critical infrastructure that supports Auckland City Hospital. Established to improve the state of critical infrastructure, improving resilience and providing a safer environment for patients, staff and visitors and scheduled across several tranches of work, BPM is overseeing design and delivery of multiple service specific orientated workstreams. A challenging project in a highly sensitive operational environment, this project is a true test to the very foundation of the term project management.

 
Oncology-02.jpg

Te Whatu Ora - Te Toka Tumai Auckland

Radiation Oncology Linear Accelerator REFURBISHMENT & REPLACEMENT

Bluewater has managed the staged upgrade and replacement of all six Linear Accelerators at Auckland Hospital Building A08. From initial client briefing through to full design management, main contractor procurement, external supplier interface, contract administration and commissioning, this critical service has had its entire suite of machines replaced and upgraded.